Monthly Archives: April 2017

Orange Park (Updates)

The playing surface at Orange Park was raised by half a foot and was leveled evenly. Finally, a perimeter wall was built around the pitch to prevent soil erosion during rain. This was done at a cost of Rs. 7 … Continue reading